Dynamic cost indexing: cost estimations and building the prototype

Cook, Andrew J. and Tanner, Graham and Williams, Victoria and Meise, Gerhard (2008) Dynamic cost indexing: cost estimations and building the prototype. In: 7th EUROCONTROL Innovative Research Workshop & Exhibition, 2 - 4 Dec 2008, EUROCONTROL Experimental Centre. (Unpublished)

Full text not available from this repository.
Official URL: http://inoworkshop.eurocontrol.fr/


The design of a decision-support prototype tool for managing flight delay costs in the pre-departure and airborne phases of a flight is described. The tool trades accelerated fuel burn and emissions charges against 'cost of time'. Costs for all major 'cost of time' components, by three cost scenarios, twelve aircraft types and by magnitude of delay are derived. Short-term opportunities for saving fuel and/or reducing environmental impacts are identified. A shift in ATM from managing delay minutes to delay cost is also supported.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: Business trajectories, cost index, cost of time, emissions, integrated disruption management
Subjects: University of Westminster > Architecture and the Built Environment > Architecture and the Built Environment, School of (No longer in use)
Depositing User: Miss Nina Watts
Date Deposited: 09 Apr 2009 11:19
Last Modified: 29 Jun 2009 13:20
URI: http://westminsterresearch.wmin.ac.uk/id/eprint/6331

Actions (login required)

Edit Item (Repository staff only) Edit Item (Repository staff only)