Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Airline costs of delayed passengers and how to estimate full network delay costs

Cook, Andrew J. and Tanner, Graham (2008) Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Airline costs of delayed passengers and how to estimate full network delay costs. Technical Report. Transport Studies Group, University of Westminster.

Full text not available from this repository.
Official URL: http://www.eurocontrol.int/eec/gallery/content/pub...
Item Type: Monograph (Technical Report)
Uncontrolled Keywords: Dynamic Cost Indexing, airline costs, delayed passengers, disruption management, hard costs, soft costs, Regulation (EC) No 261/2004, missed connections, reaccommodation, reactionary delay multipliers, cost of delay
Subjects: University of Westminster > Architecture and the Built Environment > Architecture and the Built Environment, School of (No longer in use)
Depositing User: Miss Nina Watts
Date Deposited: 15 Apr 2009 12:16
Last Modified: 19 Oct 2009 08:57
URI: http://westminsterresearch.wmin.ac.uk/id/eprint/6337

Actions (login required)

Edit Item (Repository staff only) Edit Item (Repository staff only)